On this page
Bottom Line

Installation is priced by footprint. See the current table for the base installation price, then discuss the model and site expenses with us.

Dura Shelter — model and installation planning

Confirm which current manufacturer certifications and project documents apply to the quoted building. A factory certification or general code claim does not by itself establish approval for a particular site. Obtain the required design, foundation and permit documents; the relevant authority decides its requirements and approval.

For the Dura Shelter cover you are considering, request the material specification, care instructions and correct replacement option. Compare those with the written warranty and intended use. Fabric weight alone cannot tell you how many years the cover will last at your site.

Does Max Contractors install Dura Shelter buildings?

Send the exact Dura Shelter model, dimensions, available documents and site location. We review the installation requirements and confirm whether we can accept that scope before booking. For sizes in the published table, use the stated base price and exclusions as your starting point.

Use the published footprint table to start the Dura Shelter installation conversation, then confirm the kit and site scope. Rentals, travel and lodging remain additional. A relocation, repair or replacement-cover job needs its own scope and price rather than an assumed new-kit rate.

What's the difference between single truss, double truss, and container mount?

Three Dura configurations, three different jobs they do best:

  • Timing and equipment are confirmed for the actual kit, assembly stage, prepared base, access and weather. A footprint alone does not establish crew size or working days. Send the model documents and site photographs so we can plan and quote the work.
  • For a container-mounted Dura Shelter shelter, provide the shelter model and the supporting-container layout and condition. The connection and support requirements must match those documents. Existing containers do not automatically remove the need to review foundations, anchoring or site loads.

What tends to slow us down on Dura Shelter builds?

Dura kits are well-built, so the issues are smaller than what we see on offshore brands. Two patterns worth flagging:

  1. Container squareness on container-mount builds. Dura's arch geometry assumes the two containers are level and parallel within tight tolerance. If the containers were dropped on uneven ground or the long sides aren't truly parallel, we shim and brace before the arch goes up. We always pre-check this before we open the kit.
  2. Use the attachment spacing and tensioning sequence in the instructions for this Dura Shelter cover. If the panel will not fit as specified, resolve the model, condition and dimensions before applying more force. Retensioning and later checks should follow the applicable instructions too.

How much does professional installation cost for a Dura Shelter?

Buying the building too? Ask how installation can be financed with a building package purchased through us.

Flat rate by size from our published table. The most common Dura sizes:

SizeInstall price
30'×40'Quoted by inquiry
30'×60'$13,000
40'×60'$16,000
40'×80'$18,000
50'×100'$22,000
60'×120'$31,000
70'×200'$50,000

Base installation covers crew assembly of the frame, cover installation and tensioning, and anchoring to the agreed prepared base. Equipment rentals, travel, and lodging are assessed separately after discussing your project. The kit, site preparation, foundations, and permits are separate.

How long does a Dura Shelter install take?

  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.
  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.
  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.
  • We confirm the Dura Shelter installation schedule after reviewing the model, documents, parts and prepared site. Access, lifting equipment, assembly stage and weather affect the work. Send current photographs and your preferred timing so the quote reflects the actual project.
  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.
  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.

What should I have ready before install day?

  • Timing and equipment are confirmed for the actual kit, assembly stage, prepared base, access and weather. A footprint alone does not establish crew size or working days. Send the model documents and site photographs so we can plan and quote the work.
  • Containers (if container-mount): placed, levelled, and parallel within an inch over the long side. We can level them with shims on install day, but it's faster if your equipment operator handles it ahead of us.
  • For this Dura Shelter project, settle the foundation and connection design before preparing the site. Ask for the specified anchor type, layout and embedment with the applicable site assumptions. Any proposed change needs the appropriate design review; a generic soil description or building width is not enough.
  • Kit components: unpacked and laid out, fabric bundles still rolled until tensioning day.
  • Access: 1-ton truck plus manlift on the larger kits.

Our blog post on what to expect on install day has the full site-prep checklist.

Dura Shelter vs. other Canadian-built brands — who should buy which?

Compare the actual Dura Shelter models using the same usable dimensions, access needs and supplied scope. Obtain current itemized quotes, including delivery and the documents required for your site, before deciding on value. Keep those kit costs separate from the installation quote.

Use the published footprint table to start the Dura Shelter installation conversation, then confirm the kit and site scope. Rentals, travel and lodging remain additional. A relocation, repair or replacement-cover job needs its own scope and price rather than an assumed new-kit rate.

Send the brand, dimensions, nearest town, and preferred timing. We will review the scope, separate expenses, and scheduling with you before confirming a booking.

Last updated: April 25, 2026

See Pricing for Your Size

Pricing is by footprint. Find your size on the published table.

The Math Nobody Shows You

DIY labour has a cost even when the people already work for your operation. Estimate people, days, hours, and the value of their time using your own assumptions. Add the equipment and other expenses, then compare the same scope with a professional installation quote.

Max Contractors is an independent installation company. We are not a dealer for, sponsored by, or affiliated with the manufacturers whose products we install — brand names are used only to identify the kits we work on. Where a commercial relationship exists, we disclose it.

Frequently Asked Questions

Does Max Contractors install Dura Shelter buildings?

Send the exact Dura Shelter model, dimensions, available documents and site location. We review the installation requirements and confirm whether we can accept that scope before booking. For sizes in the published table, use the stated base price and exclusions as your starting point.

How much does professional installation cost for a Dura Shelter building?

Base installation covers crew assembly of the frame, cover installation and tensioning, and anchoring to the agreed prepared base. Equipment rentals, travel, and lodging are assessed separately after discussing your project. The kit, site preparation, foundations, and permits are separate.

What's the difference between single truss, double truss, and container mount?

Timing and equipment are confirmed for the actual kit, assembly stage, prepared base, access and weather. A footprint alone does not establish crew size or working days. Send the model documents and site photographs so we can plan and quote the work.

How long does a Dura Shelter install take?

Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.

What should I have ready before my Dura Shelter installation?

For a single- or double-truss build: a level compacted gravel pad sized to footprint plus a 2-foot perimeter, all kit components unpacked and inventoried, and access for a 1-ton truck and a manlift. For a container-mount build: containers placed on the chosen pad, levelled and squared, doors functional and welded if required by spec. We do a parts check on day one before the frame goes up.

How does Dura Shelter compare to other Canadian-made brands?

Compare the actual Dura Shelter models using the same usable dimensions, access needs and supplied scope. Obtain current itemized quotes, including delivery and the documents required for your site, before deciding on value. Keep those kit costs separate from the installation quote.

Have the kit and location?

Find your base installation price, then discuss the site, separate expenses, and timing.