Bottom Line

Installation is priced by footprint. See the current table for the base installation price, then discuss the model and site expenses with us.

Red Tag Industries — Dealer, Not Manufacturer

Timing and equipment are confirmed for the actual kit, assembly stage, prepared base, access and weather. A footprint alone does not establish crew size or working days. Send the model documents and site photographs so we can plan and quote the work.

Before scheduling the Red Tag kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.

Does Max Contractors install Red Tag buildings?

Use the manufacturer and model shown on the actual Red Tag order or kit label to identify the assembly. Similar names, reseller labels or nominal dimensions do not establish that two kits share parts or installation requirements. Include the supplied manual and drawings so the correct scope can be reviewed.

Use the published footprint table to start the Red Tag installation conversation, then confirm the kit and site scope. Rentals, travel and lodging remain additional. A relocation, repair or replacement-cover job needs its own scope and price rather than an assumed new-kit rate.

What's actually in a Red Tag / Premium Storage Buildings kit?

The Suihe-platform components Red Tag ships are consistent across sizes:

  • Check the proposed Red Tag model’s design documents against your location and intended use. Review the snow and wind assumptions together with the required supports, anchors and operating conditions. A heavier cover or a different roof profile is not a substitute for that assessment.
  • For the Red Tag cover you are considering, request the material specification, care instructions and correct replacement option. Compare those with the written warranty and intended use. Fabric weight alone cannot tell you how many years the cover will last at your site.
  • Before scheduling the Red Tag kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
  • Doors: a roll-up gable door is standard on most sizes; man door and second roll-up are add-ons that need to be confirmed before the kit ships.
  • Instructions: translated from the Suihe original. The diagrams are clearer than the text — we work mostly off the diagrams. If you're trying to owner-build, expect to flip back and forth and watch a couple of YouTube reference videos.
  • Crating: plywood crate with weather-resistant wrap. Open within a week of delivery to check for shipping damage and inventory the hardware bags before anything sits long enough for moisture to find its way in.

What tends to slow us down on Red Tag builds?

Send the exact Red Tag model, dimensions, available documents and site location. We review the installation requirements and confirm whether we can accept that scope before booking. For sizes in the published table, use the stated base price and exclusions as your starting point.

  1. Before scheduling the Red Tag kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
  2. Use the attachment spacing and tensioning sequence in the instructions for this Red Tag cover. If the panel will not fit as specified, resolve the model, condition and dimensions before applying more force. Retensioning and later checks should follow the applicable instructions too.

How much does professional installation cost for a Red Tag building?

Buying the building too? Ask how installation can be financed with a building package purchased through us.

Flat rate by size from our published table. Common Red Tag / Premium Storage Buildings sizes:

SizeInstall price
20'×40'Quoted on request
30'×40'Quoted by inquiry
30'×60'$13,000
40'×60'$16,000
40'×80'$18,000
50'×100'$22,000
60'×120'$31,000

Base installation covers crew assembly of the frame, cover installation and tensioning, and anchoring to the agreed prepared base. Equipment rentals, travel, and lodging are assessed separately after discussing your project. The kit, site preparation, foundations, and permits are separate.

How long does a Red Tag install take?

  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.
  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.
  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.
  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.
  • Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.

Use the manufacturer and model shown on the actual Red Tag order or kit label to identify the assembly. Similar names, reseller labels or nominal dimensions do not establish that two kits share parts or installation requirements. Include the supplied manual and drawings so the correct scope can be reviewed.

What should I have ready before install day?

  • Timing and equipment are confirmed for the actual kit, assembly stage, prepared base, access and weather. A footprint alone does not establish crew size or working days. Send the model documents and site photographs so we can plan and quote the work.
  • Crate opened within a week of delivery: inventory hardware bags before any moisture finds its way through the wrap.
  • For this Red Tag project, settle the foundation and connection design before preparing the site. Ask for the specified anchor type, layout and embedment with the applicable site assumptions. Any proposed change needs the appropriate design review; a generic soil description or building width is not enough.
  • Access: 1-ton truck plus a manlift on anything 40-wide and up.
  • Photos of the crate and labels: if you bought the kit secondhand or through a BigIron auction, send us photos before we roll. We'll confirm the platform and any version-specific hardware notes.

Our blog post on what to expect on install day has the full site-prep checklist.

Red Tag / Premium Storage Buildings vs. premium brands — who should buy which?

For the Red Tag cover you are considering, request the material specification, care instructions and correct replacement option. Compare those with the written warranty and intended use. Fabric weight alone cannot tell you how many years the cover will last at your site.

Use the published footprint table to start the Red Tag installation conversation, then confirm the kit and site scope. Rentals, travel and lodging remain additional. A relocation, repair or replacement-cover job needs its own scope and price rather than an assumed new-kit rate.

Send the brand, dimensions, nearest town, and preferred timing. We will review the scope, separate expenses, and scheduling with you before confirming a booking.

Last updated: April 25, 2026

See Pricing for Your Size

Pricing is by footprint. Find your size on the published table.

The Math Nobody Shows You

DIY labour has a cost even when the people already work for your operation. Estimate people, days, hours, and the value of their time using your own assumptions. Add the equipment and other expenses, then compare the same scope with a professional installation quote.

Max Contractors is an independent installation company. We are not a dealer for, sponsored by, or affiliated with the manufacturers whose products we install — brand names are used only to identify the kits we work on. Where a commercial relationship exists, we disclose it.

Frequently Asked Questions

Does Max Contractors install Red Tag buildings?

Send the exact Red Tag model, dimensions, available documents and site location. We review the installation requirements and confirm whether we can accept that scope before booking. For sizes in the published table, use the stated base price and exclusions as your starting point.

How much does professional installation cost for a Red Tag building?

Base installation covers crew assembly of the frame, cover installation and tensioning, and anchoring to the agreed prepared base. Equipment rentals, travel, and lodging are assessed separately after discussing your project. The kit, site preparation, foundations, and permits are separate.

What is the Premium Storage Buildings brand actually?

Use the published footprint table to start the Red Tag installation conversation, then confirm the kit and site scope. Rentals, travel and lodging remain additional. A relocation, repair or replacement-cover job needs its own scope and price rather than an assumed new-kit rate.

How long does a Red Tag building install take?

Duration is confirmed for the exact kit and site. Frame configuration, access, weather, parts, and equipment affect the installation schedule.

What should I have ready before my Red Tag install?

Timing and equipment are confirmed for the actual kit, assembly stage, prepared base, access and weather. A footprint alone does not establish crew size or working days. Send the model documents and site photographs so we can plan and quote the work.

What if my Red Tag kit has missing parts after shipping?

Before scheduling the Red Tag kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.

Have the kit and location?

Find your base installation price, then discuss the site, separate expenses, and timing.