Bought a Fabric Building at Auction?
Model examples help identify your kit. Confirm the supplied model, dimensions, parts and technical requirements from its current documents. Send the label, manual and site location for an installation review.
Share the exact model, dimensions, and location. We review the kit and installation scope with you, with published base prices by footprint and separate equipment, travel, and lodging expenses.
Need insulation too? Explore DrySpan™ R-20 supply for your building →
On this page
Before scheduling the auction-purchased kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
The auction trade-off — and the fix
Confirm who handles technical questions, replacement parts and warranty enquiries for your auction-purchased purchase. Ask the actual seller about current availability and delivery arrangements. Keep the invoice, model documents and support contacts with your project records.
That's the trade-off: rock-bottom price, zero hand-holding. We exist to close that gap. You save money on the building. You hire professionals for the install. The total cost is still well below a factory-direct purchase with installation included, and the building goes up to spec.
Platforms we cover
Suihe, Hills Industrial, SKLP, K&J, Chery
SKLP, various branded & unbranded
Premium Storage Buildings, Gold Mountain
Gold Mountain, Suihe, Dynamic Shelters
TMG Industrial, various brands
Hills Industrial, TMG, Storage Shelter
Hills Industrial, Gold Mountain
Hills Industrial 30×40 to 50×100
Can Industrial, used buildings, imports
Suihe, Gold Mountain, Covermore, Red Tag
All brands, new & used
Red Mountain Valley, Powerfist shelters
What we deal with on auction builds
Missing parts
Before scheduling the auction-purchased kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
No manual / wrong manual / overseas docs
Before scheduling the auction-purchased kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
Used buildings (relocations)
Use the published footprint table to start the auction-purchased installation conversation, then confirm the kit and site scope. Rentals, travel and lodging remain additional. A relocation, repair or replacement-cover job needs its own scope and price rather than an assumed new-kit rate.
White-label and unknown brands
Before scheduling the auction-purchased kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
What pricing covers
Base installation covers crew assembly of the frame, cover installation and tensioning, and anchoring to the agreed prepared base. Equipment rentals, travel, and lodging are assessed separately after discussing your project. The kit, site preparation, foundations, and permits are separate.
Use the published footprint table to start the auction-purchased installation conversation, then confirm the kit and site scope. Rentals, travel and lodging remain additional. A relocation, repair or replacement-cover job needs its own scope and price rather than an assumed new-kit rate.
Pricing is by footprint. Find your size on the published table.
Send the brand, dimensions, nearest town, and preferred timing. We will review the scope, separate expenses, and scheduling with you before confirming a booking.
Last updated: April 30, 2026
DIY labour has a cost even when the people already work for your operation. Estimate people, days, hours, and the value of their time using your own assumptions. Add the equipment and other expenses, then compare the same scope with a professional installation quote.
Max Contractors is an independent installation company. We are not a dealer for, sponsored by, or affiliated with the manufacturers whose products we install — brand names are used only to identify the kits we work on. Where a commercial relationship exists, we disclose it.
Frequently Asked Questions
Can Max Contractors install a fabric building I bought at auction?
Before scheduling the auction-purchased kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
What if my auction building is missing parts?
Before scheduling the auction-purchased kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
How much does it cost to install an auction-bought fabric building?
Base installation covers crew assembly of the frame, cover installation and tensioning, and anchoring to the agreed prepared base. Equipment rentals, travel, and lodging are assessed separately after discussing your project. The kit, site preparation, foundations, and permits are separate.
What if there's no manual or it's in a language I can't read?
Before scheduling the auction-purchased kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
Can you install a used fabric building bought from a private seller?
Use the published footprint table to start the auction-purchased installation conversation, then confirm the kit and site scope. Rentals, travel and lodging remain additional. A relocation, repair or replacement-cover job needs its own scope and price rather than an assumed new-kit rate.
What if my building has no brand label at all?
Before scheduling the auction-purchased kit, check its labels and packing list against what arrived. Photograph shortages or mismatched pieces and obtain the correct replacement specification from the supplier. This avoids discovering an unresolved parts or instruction problem during assembly.
Related Brands We Install
Have the kit and location?
Find your base installation price, then discuss the site, separate expenses, and timing.